Building Safety Act 2022

Gateway 3 & Handover

Gateway 3 is the final BSR checkpoint before a new higher-risk building can be occupied. We prepare as-built fire strategies, golden thread documentation, and building safety case support for Gateway 3 submissions.

4,000+ projects delivered
7 to 14 working day turnaround
Chartered engineers, up to £5M PI
Discuss your project
We respond within 1 to 2 working days.
Get a Quote 020 3797 3053
Turnaround7 to 14 working days
Response1 to 2 working days
CoverageLondon & UK wide
PI insuranceUp to £5M
4,000+
Projects Delivered
30+ yrs
Collective Experience
7-14
Working Day Turnaround
UK Wide
Coverage
Chartered
Independent Practice
up to £5M
Professional Indemnity
What Is Gateway 3?

The final sign-off before a higher-risk building can be occupied

Gateway 3 is the completion gateway under the Building Safety Act 2022. The building cannot be occupied until the BSR confirms it has been built in accordance with the approved Gateway 2 design.

The submission includes an as-built fire strategy, the golden thread of information, a draft building safety case, and confirmation that the accountable person and mandatory occurrence reporting system are in place.

Gateway 3 represents the handover of fire safety responsibility from the construction team to the accountable person.

Legislation
Building Safety Act 2022
Gateway 3 sign-off required before occupation of any new higher-risk building.
Key Document
Golden Thread of Information
The digital record of key building safety information from design through construction and occupation.
Output
Building Safety Case
The draft safety case produced at Gateway 3 becomes the foundation for ongoing maintenance.
Related Services

You may also need

Get Started

Discuss your Gateway 3 and handover requirement

We respond to all enquiries within 1 to 2 working days with a clear scope, programme, and fee proposal.

Common Questions

Frequently asked questions

What is Gateway 3?
The final BSA 2022 checkpoint. BSR must confirm the building was built in accordance with the Gateway 2 approved design before it can be occupied.
What documentation is required?
As-built fire strategy, golden thread of information, draft building safety case, completion certificate application, and confirmation of accountable person arrangements.
What is the golden thread?
The digital record of key building safety information created during design and construction and maintained throughout the life of the building by the accountable person.
Can the building be occupied without Gateway 3?
No. Occupation without sign-off is a criminal offence under the Building Safety Act 2022.
Accreditations & Memberships
SSIP Accredited
SSIP Accredited
Institution of Mechanical Engineers
Institution of Mechanical Engineers
Homes England Approved
Homes England Approved
Constructionline Gold Member
Constructionline Gold Member
IIRSM
IIRSM
Institution of Fire Engineers
Institution of Fire Engineers
IOSH
IOSH
Social Value
Social Value
Fire Protection Association
Fire Protection Association
Acclaim Accreditation
Acclaim Accreditation
Safety and Reliability Society
Safety & Reliability Society
Chartered Engineer
Chartered Engineer
Fire Industry Association
Fire Industry Association
Institute of Fire Safety Managers
Institute of Fire Safety Managers
Get a Quote 020 3797 3053